Home > Projects > Test Rigs > Design and Construction of Test Tunnels for Medium and Large Power Plant Radiators

Design and Construction of Test Tunnels for Medium and Large Power Plant Radiators

Generator radiators of large hydropower plants have a significant impact on its efficiency. Due to this point and the needs of the client, a suitable wind tunnel has been constructed to measure the thermodynamic data of the mentioned radiators. 

This tunnel performs a hot test of radiators up to 85 °C in an innovative way with the least energy consumption.

Installed Project

Tehran Province, Iran- 2015